Water level alerts for flood response teams

Battery-powered ultrasonic sensors measure water-surface distance and send NB-IoT readings to cloud software. Response teams review level histories, receive configured messages and plan checks at monitored waterways.

Water level alerts for flood response teams, image 1 of 3Water level alerts for flood response teams, image 2 of 3Water level alerts for flood response teams, image 3 of 3
Ellenex
Headquarters
United States
Connectivity
NB-IoT
Deployment
Public SaaS, Edge/Local
Services
Installation, System Integration, Support & Maintenance

About Water level alerts for flood response teams

Water-level histories give response teams a record of how an instrumented river or stormwater location changes between visits. Ellenex connects ultrasonic instruments with cloud monitoring software for remote water infrastructure. Operators review the returned measurements and assigned notifications to decide which monitored location needs a check or an operating response.

A DUS2-N sensor sends ultrasonic pulses towards the water surface and measures their return time. That distance measurement becomes a level record using the installation's reference geometry. The battery-powered device sends readings through NB-IoT to the central monitoring platform. Software views show current values, historical graphs and mapped asset locations. Battery condition, signal quality and last communication time appear alongside the measurement record to support device checks.

Teams configure level thresholds and missed-data rules for the monitored points. Email or SMS messages direct attention to the assigned condition, and operators compare the history with the latest returned value before deciding the next step. Exports and software interfaces support sharing the record with existing response or infrastructure tools. Staff then inspect the relevant waterway or coordinate the agreed site action, using the measurements to follow changes at the instrumented location.

How it works

Sense
Measure distance from the instrument to the water surface.
Connect
Send NB-IoT readings to the central monitoring platform.
Analyze
Compare level histories with assigned threshold rules.
Act
Notify response teams to review the monitored waterway.

Does it fit your project?

Best suited to

  • Flood response operating teams
  • Stormwater infrastructure service managers
  • Remote water resource monitoring staff

You need

  • Suitable ultrasonic water-level instruments
  • Compatible NB-IoT cellular service
  • Correct installation reference and mounting
  • Level thresholds and response access

Limitations

  • Requires suitable surface view and mounting
  • Requires correct level reference configuration
  • No flood prevention or prediction guarantee
  • No public warning delivery guarantee

Cost estimate

Set your scope, see what a Water level alerts for flood response teams deployment costs, then ask Ellenex to confirm a price and lead time. The estimate is free and needs no contact details.

1Your project

United States
Any
Any
Any
None
No

2Your estimate

$1,800 – $6,200
$300 – $1,200
$1,100 – $3,300$400 – $1,700$300 – $1,200
Hardware$1,100 – $3,300

Sensors, gateways and spare units

Installation and setup$400 – $1,700

Site survey, mounting, commissioning and configuration

Software and services$300 – $1,200

Platform subscription, connectivity, data and support

IoT Apps estimate in USD for 1 site and 10 assets in the United States, from comparable deployments, reviewed September 2026. Not a quote from Ellenex. Excludes taxes, shipping, civil works and custom integration. How IoT Apps estimates costs

My budget, first year$3,300 – $4,700
Budget status

The band starts on the medium range of the estimate. Pick the one that matches your plans, or Not sure; Ellenex sees your budget as indicative unless you mark it approved.

3Ask Ellenex to confirm price and lead time

Your details

Name, company and work email are required. Phone is optional.

Hide project details

Company size, project stage and decision timing tell Ellenex how firm the project is and which offer fits: a budgeted project with a decision this quarter gets a firm price and lead time, an early enquiry gets guidance first.

Choose
Choose
Choose
Ellenex receives
Scope1 site, 10 assets, United States, any connectivityBudget$3,300 – $4,700 first year, indicativeYour noteEverything you write belowYour contactName, company and email, when you choose the vendor
Ellenex confirms
Price for this scope
Lead time
What is included and what the installation needs
Anything Ellenex should know
Ask Ellenex to confirmAdd other matching solutions

IoT Apps sends the request to Ellenex and keeps a copy. Vendors usually answer within two working days; IoT Apps follows up if you have no reply after three.

Similar solutions

See all solutions
Rising water alerts for municipal response teams
Rising water alerts for municipal response teamsby bemondis

LoRaWAN level sensors send readings to cloud rules so staff can check critical thresholds.

HydroVu for river level alerts
HydroVu for river level alertsby In-Situ

Pressure or radar instruments send measurements over cellular for mapped trends and messages.

Flood monitoring for rivers and reservoirs
Flood monitoring for rivers and reservoirsby Worldsensing

Water-level sensors, weather data and cameras send threshold alerts to the response team.

SensiFlood for watershed flood monitoring
SensiFlood for watershed flood monitoringby Evigia Systems

Water level nodes send LTE-M or satellite readings to cloud rules that trigger warnings.

LeveLine EWS
LeveLine EWSby Aquaread

Submerged sensors use cellular telemetry for rising-level warnings, SMS readings and stored charts.

Flood monitoring for emergency response teams
Flood monitoring for emergency response teamsby AEM

Rain and water-level sensors use field telemetry to drive forecasts, maps and threshold warnings.

More from Ellenex

Filter pressure checks for building maintenance teams
Filter pressure checks for building maintenance teamsDifferential probes send LoRaWAN or cellular values to software for airflow and service…
Compressor pressure records for industrial maintenance teams
Compressor pressure records for industrial maintenance teamsBattery transducers send LoRaWAN or cellular values to cloud tools for duty-cycle checks.
Remote equipment settings for field operating teams
Remote equipment settings for field operating teamsBattery sensors send LPWAN readings to cloud software with threshold rules and device…
Tank delivery tracking for distribution operating teams
Tank delivery tracking for distribution operating teamsSubmersible probes send NB-IoT values and GPS positions to a dashboard for refill…
Pressure trends for pipeline and pump teams
Pressure trends for pipeline and pump teamsBattery transducers send LoRaWAN or cellular readings to dashboards for threshold…
Cathodic protection readings for asset maintenance teams
Cathodic protection readings for asset maintenance teamsElectrical interfaces send LoRaWAN or cellular values to dashboards for voltage and…

Questions and answers

How does the ultrasonic instrument obtain its distance measurement?

It sends ultrasonic waves towards the water surface and measures the time taken for the return signal.

Which sensor model is named for stormwater and flood monitoring?

The solution names the battery-powered DUS2-N ultrasonic level sensor.

Which data connection carries the remote water-level readings?

The stormwater arrangement uses NB-IoT to send measurements to the central monitoring system.

What helps an operator check whether a sensor has stopped reporting?

The monitoring platform presents last communication time and supports configured missed-data notifications.

How is this deployment priced?

Every page carries a cost estimate by IoT Apps for your own sites and assets; set your budget and invite Ellenex to confirm a price and lead time.

What does a deployment cost?

For 1 site with 10 monitored assets in United States, IoT Apps estimates $1,800 – $6,200 in the first year and $300 – $1,200 every year after. This is an estimate based on comparable deployments, not a quote from Ellenex.

VendorEllenex, United States
ConnectivityNB-IoT
DeploymentPublic SaaS, Edge/Local
ServicesInstallation, System Integration, Support & Maintenance, Data Analytics, Software Platform
Hardware modelRequired, Mixed Ecosystem, Gateway-Agnostic
Available inWorldwide

Uses this hardware

Mandatory
Ellenex DUS3 Ultrasonic Distance Sensor
Ellenex DUS3 Ultrasonic Distance SensorEllenex · DUS3 · Sensor, LPWAN
Mandatory
Ellenex PLS3 Level Sensor
Ellenex PLS3 Level SensorEllenex · PLS3 · Sensor, LPWAN

Have a question for Ellenex?

IoT Apps Enterprise

Not sure this fits your deployment?

Ask the AI Solution Architect: compare this solution against alternatives, check connectivity for your region and get integration guidance. Included with IoT Apps Enterprise.

Ask the Architect
IoT Apps is an independent platform. Listings do not imply endorsement by or partnership with the vendor. Estimates are indicative and based on comparable deployments, not on vendor quotes.